2021 Road Trip - EN15 South Dakota Complete: August 31, 2021 1400UTC

The EN15 South Dakota activation is complete.  Thank-you to the 56 callers who completed QSOs.  As usual conditions started out fast and became harder as the morning went on.  Sorry I was not able to complete with a couple of callers.  After about 5 hours I was getting very tired and was having trouble seeing the monitor :-) so we stopped the operation at sunrise here after starting at midnight.

I am leaving now for a campground north of Duluth Minnesota near the border with Canada.  Tomorrow I have a short drive to a campground in Houghton, Michigan which I will use as a base camp for the first four grids I will activate this week.

The EN15 South Dakota log is uploaded to LoTW.

Comments

Popular posts from this blog