2021 Road Trip - EN15 South Dakota Complete: August 31, 2021 1400UTC
The EN15 South Dakota activation is complete. Thank-you to the 56 callers who completed QSOs. As usual conditions started out fast and became harder as the morning went on. Sorry I was not able to complete with a couple of callers. After about 5 hours I was getting very tired and was having trouble seeing the monitor :-) so we stopped the operation at sunrise here after starting at midnight.
I am leaving now for a campground north of Duluth Minnesota near the border with Canada. Tomorrow I have a short drive to a campground in Houghton, Michigan which I will use as a base camp for the first four grids I will activate this week.
The EN15 South Dakota log is uploaded to LoTW.
Comments
Post a Comment