2021 Road Trip - Update 61: EN75 EN85 Activation Plan - September 9, 2021 1827UTC

I have decided to activate EN75 and EN85 instead of EN76 and EN86.  I have found outstanding locations on beaches, on Lake Huron, with no power lines or other interference sources.

EN75XX22 - Moonrise 1526UTC September 10, 2021.  2M EME 144.132 2nd JT65B.  I plan to be QRV until at least 2000UTC (Short EU Window)

EN85AX11 - Moonrise 1646UTC September 11, 2021.  2M EME 144.132 2nd JT65B.  I plan to be QRV until at least 2100UTC (Short EU Window)

EN75 Location in Moonrise direction



EN85 Location in Moonrise direction


Clear view to the horizon in both locations.

These will be the last activations planned for Michigan on this trip.


Comments

Popular posts from this blog