2021 Road Trip - Update 61: EN75 EN85 Activation Plan - September 9, 2021 1827UTC
I have decided to activate EN75 and EN85 instead of EN76 and EN86. I have found outstanding locations on beaches, on Lake Huron, with no power lines or other interference sources.
EN75XX22 - Moonrise 1526UTC September 10, 2021. 2M EME 144.132 2nd JT65B. I plan to be QRV until at least 2000UTC (Short EU Window)
EN85AX11 - Moonrise 1646UTC September 11, 2021. 2M EME 144.132 2nd JT65B. I plan to be QRV until at least 2100UTC (Short EU Window)
EN75 Location in Moonrise direction
Comments
Post a Comment